Artisan Market of Tlaxco | VRTICAL

Tlaxco / Mexico / 2017

29
29 Love 4,587 Visits Published

During year 2015th Vrtical developed a participative master plan for the municipality of Tlaxco, whose main objective is to recover the region’s economy by improving tourism, the Artisan Market is the first build project brought out of the plan. Taking advantage of the Cinergy of the declaration of Tlaxco as a tourist relevant town, a decentralized management proposal is the main concept for the new market, were even though the building is in the main town, each of the stands belongs and represents dierent regions of the municipality. The project recovers the walls and foundations of a previous market while adding new finishing’s. The roof uses vernacular tradition of building with wood and at the same time it provides the market with natural light by bouncing sun light into the diagonal white surfaces. On the other hand, a double façade was built trough out the main façade creating a public corridor trying to blur the limits between the public and private space.


Location: Tlaxco, Tlaxcala, México
Client: Tlaxcala Government
Year: 2017
Budget: US $243,000.00

Design: VRTICAL
Arq. Luis Beltrán del Río and Arq. Andrew Sosa
Construction: Arq. Jorge Rivera

Photopraphy: Rafael Gamo and Enrique Márquez Abella

Collaborators:
Ing. Alejandro Solano
Ing. Dolores Galicia
Ing. Hector Rojas
Arq. Ana Lourdes Esquer
Arq. Ximena Rebollo
Arq. Arelly Blas

29 users love this project
Comments
    comment
    user
    Enlarge image

    During year 2015th Vrtical developed a participative master plan for the municipality of Tlaxco, whose main objective is to recover the region’s economy by improving tourism, the Artisan Market is the first build project brought out of the plan. Taking advantage of the Cinergy of the declaration of Tlaxco as a tourist relevant town, a decentralized management proposal is the main concept for the new market, were even though the building is in the main town, each of...

    Project details
    • Year 2017
    • Work finished in 2017
    • Status Completed works
    • Type Markets / Building Recovery and Renewal
    Archilovers On Instagram
    Lovers 29 users