HHF – Schulcampus Hanhoopsfeld | AllesWirdGut Architektur ZT GmbH

Better Learning Hamburg / Germany / 2019

0
0 Love 362 Visits Published

Two schools, one typology, infinite possibilities. For the Lessing Neighborhood School and the Alexander von Humboldt Grammar School, AllesWirdGut and DnD Landschaftsplanung laid out a generous extensive park landscape with free-standing, well-proportioned solitaire buildings. Positioned in a staggered array, the structures are subtly gradated in height and thus align with the dynamic of the marked step in the terrain. The shared multi-purpose building—the hub and center of the campus—is situated on the visual axis between the two schools’ main entrances and provides an urban-planning reference point that is visible from all sides. The compact units are all defined by straight lines and articulated in a contemporary architectural language, which, for example, expresses itself in the uniform clinker-clad façades. Inside the teaching buildings, the classrooms are arranged in a circle around a central atrium like the blades of a windmill. Open areas and niches provide facilities for a variety of forms of teaching and learning. The outdoor areas, which include a biotope pond, an open-air theater, and crop trial plots, offer individually usable and community areas for all. A homogenous and future-oriented campus that that seamlessly fits in with the existing built ensemble while creating room for individual development.

0 users love this project
Comments
    comment
    user
    Enlarge image

    Two schools, one typology, infinite possibilities. For the Lessing Neighborhood School and the Alexander von Humboldt Grammar School, AllesWirdGut and DnD Landschaftsplanung laid out a generous extensive park landscape with free-standing, well-proportioned solitaire buildings. Positioned in a staggered array, the structures are subtly gradated in height and thus align with the dynamic of the marked step in the terrain. The shared multi-purpose building—the hub and center of the...

    Project details
    • Year 2019
    • Work started in 2013
    • Work finished in 2019
    • Main structure Masonry
    • Client GMH | Gebäudemanagement Hamburg GmbH
    • Status Completed works
    • Type Schools/Institutes
    Archilovers On Instagram